Google Sheets WORKDAY Function: How to Use It

How-to basics · Updated November 23, 2026

The Google Sheets WORKDAY function returns the date that falls a given number of working days (excluding weekends and optionally holidays) before or after a start date. Its syntax is WORKDAY(start_date, num_days, [holidays]), and it is part of the Date category of functions.

What Is the WORKDAY Function For?

WORKDAY is used to calculate due dates, delivery dates, project milestones, or any deadline that should skip Saturdays and Sundays. For example, if a task starts on a Monday and takes 5 working days, WORKDAY will give you the following Monday, not the Saturday. This is different from simply adding 5 days with a formula like =A2+5, which would include the weekend.

The function is especially useful in project planning, HR (calculating notice periods), finance (settlement dates), and any schedule where weekends are non-working days. It is the Google Sheets equivalent of Excel’s WORKDAY function, though the two have slightly different default weekend definitions (see the comparison section below).

How the Syntax Works

You need three pieces of information:

  • start_date – the date from which you count. This can be a cell reference (e.g., A2), a date entered with the DATE function (e.g., DATE(2025,1,6)), or a date returned by another formula. Avoid typing dates as text like “1/6/2025” because Sheets may not interpret it correctly in all locales.
  • num_days – the number of working days to add. Use a positive number for a future date, a negative number for a past date, and 0 to get the same date if it is a working day (otherwise the next working day).
  • [holidays] – an optional range or array of dates to exclude, such as public holidays. This is a range reference like B2:B10 or an array constant like {DATE(2025,1,1), DATE(2025,12,25)}. If omitted, only weekends are excluded.

Here is a concrete example. Suppose cell A1 contains DATE(2025,1,6) (a Monday) and cell B1 contains 5. The formula =WORKDAY(A1, B1) returns 1/13/2025 (the following Monday), because the five working days are Jan 6, 7, 8, 9, and 10 – skipping Jan 11 and 12.

How to Use WORKDAY in a Real Spreadsheet

Let’s say you have a project start date in cell A2 and a task duration in days in cell B2. To find the expected completion date, use:

=WORKDAY(A2, B2)

If you also have a list of holidays in cells D2:D5, include them:

=WORKDAY(A2, B2, D2:D5)

For a negative number, like calculating the start date if you know the end date and duration, use something like:

=WORKDAY(C2, -B2)

This returns the date that is B2 working days before C2. For example, if C2 is 1/31/2025 (a Friday) and B2 is 5, the result is 1/24/2025 (a Friday), because the five working days before Jan 31 are Jan 24, 27, 28, 29, and 30 (skipping Jan 25–26).

Choosing Between WORKDAY, WORKDAY.INTL, and NETWORKDAYS

Google Sheets has several related functions:

  • WORKDAY – counts only Monday–Friday as working days. It is the simplest choice when your weekends are Saturday and Sunday.
  • WORKDAY.INTL – lets you define which days are weekends (e.g., only Sunday, or Friday–Saturday). Use it when your workweek is different from the standard Monday–Friday. Its syntax is WORKDAY.INTL(start_date, num_days, [weekend], [holidays]).
  • NETWORKDAYS – returns the number of working days between two dates, not the end date. Its syntax is NETWORKDAYS(start_date, end_date, [holidays]). Use it when you need to count days, not find a date.

For most users, WORKDAY is enough. If you have a non-standard weekend, switch to WORKDAY.INTL. If you need to count working days between two dates, use NETWORKDAYS.

Common Problems and How to Fix Them

Here are typical issues you might encounter:

  • #VALUE! error – This usually means the start_date is not a valid date. Check that the cell contains an actual date, not text. Use the DATE function to build dates from year, month, day.
  • #NUM! error – Occurs if the num_days argument is not a number, or if the result is outside the valid date range (years 1900 to 9999). Ensure num_days is numeric.
  • Holidays not being excluded – Make sure the holidays range contains actual dates, not text. Also confirm that the range is correct; for example, if you have 5 holiday dates in D2:D6, use D2:D6, not D2:D5.
  • Unexpected weekend behavior – WORKDAY always treats Saturday and Sunday as weekends. If your weekend is different, you must use WORKDAY.INTL.
  • Date formatting shows a number – If the result appears as a serial number (like 45678), apply a date format via Format > Number > Date.

WORKDAY vs. Excel’s WORKDAY

Both Google Sheets and Excel have a WORKDAY function with the same syntax and purpose. The main difference is that Excel’s WORKDAY treats weekends as Saturday and Sunday, just like Sheets. However, Excel’s WORKDAY.INTL uses a different weekend code system (e.g., 1 for Sunday, 2 for Monday, etc.), while Sheets uses a string like “0100000” or a number 1–7. Also, in Excel, the holidays argument can be a range or an array constant, but if you use an array constant, it must be entered as an array formula in older versions. In Sheets, you can simply use an array constant like {DATE(2025,1,1)} without special entry.

Another difference: Sheets automatically recalculates when the start date or holidays change, just like Excel. Both handle negative num_days correctly.

Practical Examples and Use Cases

Here are a few scenarios where WORKDAY shines:

  • Project deadline – If a project starts on 2025-02-03 and takes 10 working days, =WORKDAY(DATE(2025,2,3), 10) returns 2025-02-14 (a Friday).
  • Invoice due date – If an invoice is issued on 2025-03-10 and payment is due in 30 working days, =WORKDAY(DATE(2025,3,10), 30) gives 2025-04-21 (a Monday).
  • Backward calculation – If a report is due on 2025-04-30 and you need to start 5 working days earlier, =WORKDAY(DATE(2025,4,30), -5) returns 2025-04-23 (a Wednesday).
  • With holidays – If you have holidays in H2:H4 (e.g., 2025-01-01, 2025-07-04, 2025-12-25), and start on 2025-12-22 with 5 working days, =WORKDAY(DATE(2025,12,22), 5, H2:H4) returns 2025-12-30 (a Tuesday), because Dec 25 is excluded.

Frequently Asked Questions

Can WORKDAY count only weekdays, not weekends? Yes, that is its default behavior. It always excludes Saturday and Sunday. If you need a different weekend, use WORKDAY.INTL.

How do I add 10 working days to a date in Google Sheets? Use =WORKDAY(A2, 10) where A2 contains your start date. The result will be a date 10 working days later, skipping weekends.

What if I want to exclude holidays as well? Add a third argument with a range of holiday dates, like =WORKDAY(A2, 10, C2:C10). Make sure the holiday cells contain real dates.

Why does my WORKDAY formula return a number instead of a date? The cell is probably formatted as a number. Go to Format > Number > Date to display it as a date.

Does WORKDAY work with negative numbers? Yes, a negative num_days returns a date before the start date, skipping weekends in reverse. For example, =WORKDAY(DATE(2025,1,10), -2) returns 2025-01-08 (a Wednesday).

Is WORKDAY available in Excel too? Yes, Excel has the same function with the same syntax. The main difference is in WORKDAY.INTL’s weekend codes.

Related

Try it: the Date Difference Calculator: days, months, years and weekdays between two dates, with the DATEDIF formulas.

More in How-to basics

Sources: Function behaviour and menu paths: Microsoft Support documentation for Excel. Method & sources

Spotted an error in this guide? Let us know.