Forecast Graph in Excel: How to Create One

Charts & pivot tables · Updated November 23, 2026

To create a forecast graph in Excel, use the built-in Forecast Sheet feature: select your historical data (dates and values), go to the Data tab, and click Forecast Sheet in the Forecast group. Excel then generates a line chart with projected future values and a confidence interval, which you can customize and place on a new worksheet.

What Is a Forecast Graph?

A forecast graph is a line chart that extends your historical data into the future using a statistical model. Excel’s Forecast Sheet uses an exponential smoothing (ETS) algorithm, which weighs recent observations more heavily than older ones. The result is a smooth trend line that predicts future values, along with an upper and lower confidence band that shows the uncertainty around the prediction. This is different from a simple trendline added to a scatter plot, which uses linear or polynomial regression and does not provide a confidence interval.

How to Create a Forecast Graph (Step-by-Step)

Here is the exact process for Excel for Microsoft 365 on Windows. On Mac, the steps are identical; on Excel for the web, the Forecast Sheet feature is not available, so you would need to use the FORECAST.ETS function manually.

  1. Arrange your data in two columns: one for dates or time periods (e.g., A2:A25) and one for the values (e.g., B2:B25). The dates must be evenly spaced (daily, monthly, etc.) and in ascending order.
  2. Select both columns, including headers.
  3. Go to the Data tab and click Forecast Sheet (in the Forecast group).
  4. In the Create Forecast Worksheet dialog, Excel previews the chart. Adjust the Forecast End date and the Confidence Interval (default is 95%) as needed.
  5. Click Create. Excel inserts a new worksheet with a forecast table (historical and predicted values) and the chart.

If you prefer to build the chart manually, you can use the FORECAST.ETS function to generate future values, then add them to your data and create a line chart. For example, with dates in A2:A13 and sales in B2:B13, and future dates in A14:A16, enter in B14: =FORECAST.ETS(A14, $B$2:$B$13, $A$2:$A$13) and copy down. Then select all data and insert a line chart.

Understanding the Forecast Sheet Output

The Forecast Sheet creates a table with three columns: Historical, Forecast, and Lower Confidence Bound and Upper Confidence Bound (the latter two are shown as a shaded area on the chart). The forecast values are calculated using the ETS algorithm, which automatically detects seasonality and trend. The confidence interval (default 95%) means that if the model is correct, there is a 95% chance the actual future value will fall within the shaded band. You can change the interval in the dialog before creating the sheet.

Choosing the Right Data and Settings

For a reliable forecast, your historical data should have a clear pattern—trend or seasonality—and no gaps. Excel can handle up to a few thousand data points, but too much noise will reduce accuracy. In the Create Forecast Worksheet dialog, you can click Options to adjust:

  • Forecast Start – choose to start forecasting from a specific date (e.g., after a known change).
  • Confidence Interval – lower (e.g., 80%) gives a narrower band; higher (99%) gives a wider band.
  • Seasonality – set automatically or manually (e.g., 12 for monthly data with yearly seasonality).
  • Timeline Range – the date column; must be continuous and sorted.

Common Problems and How to Fix Them

If you get an error or a poor forecast, check these issues:

  • Dates not recognized as dates – ensure the timeline column contains real date values, not text. Select the column and press Ctrl+Shift+# (Windows) or Cmd+Shift+# (Mac) to format as date.
  • Missing or duplicate dates – Excel requires a continuous timeline. Fill gaps or remove duplicates before forecasting.
  • Too few data points – with fewer than about 10 observations, the forecast is unreliable; Excel may show a warning.
  • Constant or non-numeric values – the values column must contain numbers; if not, Excel returns a #VALUE! error.

Forecast Sheet vs. Manual Trendline

Many users wonder whether to use the Forecast Sheet or simply add a trendline to a scatter chart. Here’s the difference:

  • Forecast Sheet – uses exponential smoothing, provides confidence intervals, handles seasonality, and outputs a table of predicted values. It is the better choice for time-series data with patterns.
  • Trendline – a simple regression line (linear, exponential, etc.) that you can extend forward by setting the “Forward” period in the trendline options. It does not show confidence intervals and is less robust for seasonal data.

For a quick estimate, a trendline is fine; for a professional forecast, use the Forecast Sheet.

Costs and Safety Considerations

The Forecast Sheet is included in all desktop versions of Excel (Microsoft 365, Excel 2021, 2019, and 2016). There is no extra cost. For Excel for the web, you can use the FORECAST.ETS function, but the chart must be created manually. Always keep your original data intact—the Forecast Sheet creates a new worksheet, so you don’t lose anything. When using forecasted values for business or financial decisions, remember that they are statistical estimates, not guarantees. Validate the model by comparing forecasts to actual outcomes when they become available.

Frequently Asked Questions

Can I create a forecast graph in Excel for Mac?

Yes, the Forecast Sheet feature is available in Excel for Mac (Microsoft 365 and 2021). The steps are the same: select your data, go to the Data tab, and click Forecast Sheet. The only difference is that some keyboard shortcuts differ (e.g., Cmd instead of Ctrl).

Why is my Forecast Sheet button grayed out?

The button is disabled when your data is not in a suitable format. Check that you have at least two columns of data (timeline and values), that the timeline is numeric or date, and that there are no blank rows or columns within the selection. Also, the feature requires a continuous timeline—if you have gaps, Excel may gray it out.

How do I add a forecast to an existing chart?

You cannot directly add a forecast to an existing chart. Instead, create the forecast using the Forecast Sheet, which generates a new chart. Alternatively, you can manually calculate future values with the FORECAST.ETS function, add them to your data, and then update the chart’s data range.

What does the confidence interval mean in a forecast graph?

The confidence interval (default 95%) represents the range in which the actual future value is expected to fall with that level of certainty. A wider interval (e.g., 99%) makes the shaded band larger, reflecting more uncertainty. It is not a prediction of the exact value, but a statistical measure of precision.

Can I forecast with non-date timelines, like periods 1, 2, 3?

Yes, you can use numeric periods (1, 2, 3, …) as the timeline. Excel treats them as equally spaced. Just ensure the numbers are in ascending order and there are no duplicates.

Related

Try it: the Percentage Formula Generator: percent of, percent change, increase and decrease, with the formula.

More in Charts & pivot tables

Sources: Function behaviour and menu paths: Microsoft Support documentation for Excel. Method & sources

Spotted an error in this guide? Let us know.