Charts to Track Project Progress: 7 Types That Work

Charts & pivot tables · Updated November 22, 2026

The most effective charts for tracking project progress are Gantt charts, burndown charts, burnup charts, Kanban boards, milestone charts, velocity charts, and cumulative flow diagrams. Each serves a different purpose—Gantt charts show schedule and dependencies, while burndown and burnup charts focus on work remaining versus completed. For a single project, most teams use a Gantt chart for planning and a burndown or Kanban board for day-to-day tracking.

Why Chart Selection Matters

Project tracking charts convert raw task data into a visual that stakeholders can read at a glance. Without a chart, progress is buried in spreadsheets, emails, and meeting notes. A good chart answers three questions: Are we on schedule? Are we on budget? Are we delivering the right scope? Different charts answer different subsets of these questions. Choosing the wrong chart leads to misleading signals—for example, a milestone chart shows you hit a date but hides that the team worked 60-hour weeks to get there. The chart you pick should match the project’s methodology (waterfall vs. agile), the audience (executives vs. team members), and the main risk you need to monitor (time, scope, or throughput).

Gantt Charts: The Standard for Schedule Tracking

A Gantt chart displays tasks as horizontal bars along a timeline. Each bar’s length represents duration, and its position shows start and end dates. Dependencies appear as arrows linking one bar to another. This is the default choice for waterfall projects with defined phases and fixed deadlines.

  • Best for: construction, event planning, software releases with fixed dates, any project with sequential tasks.
  • Key elements: task names, start/end dates, duration, dependencies, milestones (diamonds), and progress percent (shaded portion of bar).
  • Limitations: Does not show work remaining in hours, only time elapsed. Updates require manual effort unless using software like Microsoft Project, Smartsheet, or TeamGantt.

To create a basic Gantt chart in Excel, use a stacked bar chart where the first series is the start date (set to no fill) and the second series is duration. For example, with tasks in A2:A5, start dates in B2:B5, and durations in C2:C5, select the data and insert a stacked bar chart, then format the first series as transparent. This works in Excel 365 and Excel for the web, though the web version lacks some formatting shortcuts.

Burndown and Burnup Charts: Agile Work Tracking

Burndown charts plot remaining work (on the Y-axis) against time (on the X-axis). The line starts at the total estimated effort and slopes downward to zero by the sprint end. Burnup charts are the inverse: they plot completed work upward toward a total scope line. Both are staples in Scrum and Kanban teams.

  • Burndown answers: “How much work is left, and will we finish on time?”
  • Burnup answers: “How much have we done, and is scope changing?”

A common misconception is that burndown charts show productivity. They actually show remaining effort, which can go up if the team adds tasks mid-sprint. Burnup charts handle scope changes better because the total line moves with added work. To create a burnup chart in Excel, list sprint days in column A, cumulative completed points in column B, and total scope in column C. Insert a line chart with two series. For a burndown, use remaining points instead of completed.

Kanban Boards: Visualizing Workflow and Bottlenecks

Kanban boards use columns (To Do, In Progress, Done) and cards that move left to right. They are not time-based; they track the flow of work items. The board itself is a chart of work status. Tools like Trello, Jira, and Asana use this model, but you can build one in Excel with conditional formatting and data validation.

The real power of Kanban is the cumulative flow diagram (CFD), which shows the number of items in each column over time. A CFD is a stacked area chart where each color band represents a column. If the “In Progress” band widens, you have a bottleneck. To make a CFD in Excel, record counts per column at daily intervals, then insert a stacked area chart. This requires consistent data entry but reveals delays that a simple board hides.

Milestone Charts: Executive-Friendly Summaries

Milestone charts show only key dates—project start, phase completions, approvals, and final delivery. Each milestone is a diamond or marker on a timeline. They omit task-level detail, making them ideal for steering committees or clients who need a high-level view.

Milestone charts are not sufficient for day-to-day management because they do not show critical path or slack. However, they are excellent for reporting. In Excel, you can create a milestone chart using a scatter plot with dates on the X-axis and a constant Y-value for all points, then label each point with the milestone name. Alternatively, use a simple table with conditional formatting to highlight upcoming dates within 7 days.

Velocity and Throughput Charts: Measuring Team Capacity

Velocity charts track the number of story points or work units completed per sprint. They are used in Scrum to forecast how much work a team can handle in future sprints. Throughput charts, common in Kanban, track completed items per week. Both are bar charts over time.

Velocity is not a performance metric; it is a planning metric. If a team completes 30 points in Sprint 1 and 35 in Sprint 2, you estimate the next sprint at 30–35 points. However, velocity is only reliable after several sprints of stable team composition. In Excel, create a velocity chart by listing sprint numbers in column A and completed points in column B, then insert a column chart. Add a moving average line to smooth fluctuations.

How to Choose the Right Chart for Your Project

There is no single best chart; the right one depends on context. Use this decision guide:

  • Waterfall project with fixed milestones? → Gantt chart for schedule, milestone chart for reporting.
  • Scrum sprint with a set duration? → Burndown chart for daily standups, velocity chart for planning.
  • Kanban with continuous flow? → Kanban board for work items, cumulative flow diagram for bottlenecks.
  • Executive stakeholders who want one slide? → Milestone chart or a simple percent-complete bar chart.
  • Multiple teams or complex dependencies? → Gantt chart with dependency lines, or a network diagram (PERT) if you need critical path analysis.

Also consider your audience’s familiarity. Executives rarely read burndown charts; they want to know “are we on track?” A simple red/yellow/green status table with a milestone chart often works better than a detailed Gantt. Conversely, a development team needs the granularity of a burndown or Kanban board to self-organize.

Common Mistakes and How to Avoid Them

Even with the right chart, mistakes undermine accuracy. The most frequent errors are:

  • Not updating data regularly. A chart is only as good as its last update. Set a recurring calendar reminder to refresh data daily or weekly.
  • Using percent complete subjectively. “50% done” often means “I’ve started.” Define completion criteria upfront, such as “code merged and tested” rather than “code written.”
  • Ignoring scope changes. If new tasks are added, update the baseline. A burndown chart that never increases is misleading if the team added work.
  • Confusing hours with story points. Story points are relative effort, not hours. Do not convert them directly.
  • Overcrowding the chart. A Gantt with 200 tasks is unreadable. Roll up tasks into phases for reporting, keep the detailed version for the team.

Another common question: “Can I use a pie chart for progress?” A pie chart showing percent complete vs. remaining is visually simple but hides where the work is stuck. Use it only for a single deliverable, not a project with multiple workstreams.

Tools and Costs: From Free to Enterprise

You do not need expensive software to start. Excel or Google Sheets can handle Gantt, burndown, and velocity charts with manual data entry. Free tiers exist in Trello, Asana, and Jira (for up to 10 users) that include Kanban boards and basic reporting. Paid tools like Smartsheet, Microsoft Project, and Monday.com add automation, real-time collaboration, and dependency management, typically costing $10–$30 per user per month. Enterprise tools like Planview or Jira Align are for large portfolios and cost more.

For a small team on a budget, start with a Kanban board in Trello (free) and export data to Excel for a cumulative flow diagram. For a fixed-date project, use TeamGantt’s free trial to build a Gantt, then screenshot it for reporting. The main cost is not the tool but the time spent keeping data accurate.

Frequently Asked Questions

What is the difference between a burndown and a burnup chart?

A burndown chart shows remaining work decreasing over time, starting at the total estimate and ending at zero. A burnup chart shows completed work increasing toward a total scope line. Burnup is better when scope changes because the total line moves, making it obvious that new work was added. Burndown can look like a failure if scope grows, even if the team is working well.

How do I track project progress without using any software?

Use a physical whiteboard with sticky notes for a Kanban board, or a printed Gantt chart with a marker to shade completed days. For a burndown, draw a graph on paper and update it daily. The method works if the team commits to updates. The limitation is no automatic calculations or historical data, so you lose the ability to analyze trends over months.

Can Excel create a Gantt chart automatically?

Excel does not have a one-click Gantt chart button, but you can build one with a stacked bar chart in about five minutes. Enter start dates and durations, insert a stacked bar chart, then make the first series invisible by setting its fill to “No Fill.” Excel 365 also has a “Gantt Chart” template in the template gallery, though it is a pre-formatted worksheet, not a native chart type.

What chart shows critical path?

A network diagram (PERT chart) shows critical path, not a standard Gantt. In Excel, you can create a PERT chart using shapes and connectors, but it is manual. Dedicated tools like Microsoft Project calculate critical path automatically. For most projects, a Gantt chart with dependency arrows is sufficient to spot the longest sequence of dependent tasks.

How often should I update my progress chart?

Daily for burndown and Kanban boards during a sprint, weekly for Gantt charts and milestone reports. The update frequency should match how often decisions are made from the data. Updating a Gantt daily is overkill if the team only reviews it at weekly status meetings. The key is consistency—irregular updates make trends unreliable.

Is a percentage complete bar chart enough for project tracking?

It is enough for a very small project with one deliverable. For multi-task projects, a single percentage hides which tasks are behind. A better approach is a table with per-task percent complete and a conditional formatting data bar, so you can see at a glance which tasks are lagging. Use a summary percentage only for executive reporting, not for day-to-day management.

Related

Try it: the Percentage Formula Generator: percent of, percent change, increase and decrease, with the formula.